|
Success Stories
The following project are just a
sampling of the impressive results possible with
Integra products.
Large Railroad
This job required the remediation of
contaminated soil beneath track and rock
ballast. Note the TPH decrease over a period
of 49 days. Desert conditions required
our team to use special procedures

Aircraft
Manufacturer
The following results are from PCB and
TPH contaminated soil in Dallas. TPH
concentrations have probably continued to
fall since September. There is no detectable
PCB left in the soil at all.

Heavy
Crude Spill
This project took place near Tampico,
Mexico. Over several years, spillage
from a storage tank, along with general pipe
leaks, had led to extremely heavy
contamination by thick crude products in the
soil. Outstanding results were achieved.

State of
New York
The floor of a New-York electrical vault
had become highly contaminated with
various PCB’s. Local sub-contracting forbade
the use of the products for more than 38
days, but impressive results were still
possible.

|